Arenq

Success Stoires -
Gantry Crane

Application: Axiliary Power

Location: JNPT, Mumbai

  • Existing Power Sources:
  • DG Set, Lead Acid Battery
  • Operational hours/day: 12+ Hours
  • Cabin Operator work/day 18+ Hours
  • Using Lead Acid batteries: 4 Nos. x 12 V 200 AH
  • Loading included: Crane Operation, Cabin Lights, Fans, AC
  • 1 Nos. X 48V 168 AH LFP Battery with 8.064 Kwh stored energy, 50 kg weight
  • 2000 Cycles at 0.5 C Charging
  • 3+ hrs. back-up
  • Solution coupled with PCS system
  • BMS display to share health of battery in real-time

Problem Statement

  • Existing Power Sources:
  • DG Set, Lead Acid Battery
  • Operational hours/day: 12+ Hours
  • Cabin Operator work/day 18+ Hours
  • Using Lead Acid batteries: 4 Nos. x 12 V 200 AH
  • Loading included: Crane Operation, Cabin Lights, Fans, AC

Solution From Arneq

  • 1 Nos. X 48V 168 AH LFP Battery with 8.064 Kwh stored energy, 50 kg weight
  • 2000 Cycles at 0.5 C Charging
  • 3+ hrs. back-up
  • Solution coupled with PCS system
  • BMS display to share health of battery in real-time

Results

Product Footprint reduction by 75%

Maintenance free Operation

Reduced Carbon Footprint


Extended Life, Lower TCO

Need Help?
Scroll to Top