- Existing Power Sources:
- 12 Nos. X 380 W, 8 Nos. X 550 W (8.96kW) Solar Panel, ~800 sq. ft footprint
- 48 V 1000 AH Lead acid flooded Battery packs
- 15 kVA Diesel Genset
- Frequent power cuts of 2-3 hrs/ day
- Spend of 20K to 30K /month on Diesel to run DG
- Lead acid solution degraded after 2 years of operation, retracting initial expenses
- Loads included: Office Lighting and Fans, 2 dispensing nozzles and station lighting
- 19 Kwh battery, 8 KW Solar
- 48V 400AH LFP Battery packs, 0.5 C / 1C Charging
- 6 hrs. back-up for 3 kW cont. load, 4.5 Hrs. charging time
- System coupled with Charge controllers and PCS system
- BMS display to share health of battery in real-time
Problem Statement
- Existing Power Sources:
- 12 Nos. X 380 W, 8 Nos. X 550 W (8.96kW) Solar Panel, ~800 sq. ft footprint
- 48 V 1000 AH Lead acid flooded Battery packs
- 15 kVA Diesel Genset
- Frequent power cuts of 2-3 hrs/ day
- Spend of 20K to 30K /month on Diesel to run DG
- Lead acid solution degraded after 2 years of operation, retracting initial expenses
- Loads included: Office Lighting and Fans, 2 dispensing nozzles and station lighting
Solution From Arneq
- 19 Kwh battery, 8 KW Solar
- 48V 400AH LFP Battery packs, 0.5 C / 1C Charging
- 6 hrs. back-up for 3 kW cont. load, 4.5 Hrs. charging time
- System coupled with Charge controllers and PCS system
- BMS display to share health of battery in real-time
Results
Savings ₹ 35K/Month
Reduced Carbon Footprint
Maintenance free Operation
Payback 3 years
Tax Benefits
Minimal grid dependency